Qualifier values of 4017 in D02A
Delivery plan commitment level code (an1..3)
Code specifying the level of commitment to a delivery plan.
Code | Description |
---|---|
1 |
Firm Indicates that the scheduling information is a firm commitment. |
2 |
Commitment for manufacturing and material Authorizes the supplier to start the manufacturing of goods. |
3 |
Commitment for material Authorizes the manufacturer to order material required for manufacturing specified goods. |
4 |
Planning/forecast An estimate of future requirements based on trends and actual information. |
5 |
Short delivered on previous delivery Part of a consignment which was not delivered when the original delivery was made. |
6 |
Capacity available Capacity is available to meet the requested scheduling demands. |
9 |
User defined The user can interpret the meaning of the values from information exchanged previously. |
10 |
Immediate Indicates that the scheduling information is for immediate execution. |
11 |
Pilot/Pre-volume Initial products required in advance of the normal production process. |
12 |
Planning An estimate of future requirements. |
13 |
Potential order increase The possibility and magnitude of a schedule fluctuation. |
14 |
Average plant usage The usual amount that a manufacturing facility will use over a specified duration. |
15 |
First time reported firm Initial confirmation of a material requirement. |
16 |
Maximum The highest attainable amount. |
17 |
Tooling capacity The maximum amount that the process was designed to accommodate. |
18 |
Normal tooling capacity The anticipated amount that the process was designed to accommodate over a specific period of time. |
19 |
Prototype The preliminary version of a product or service. |
20 |
Strike protection Product level that is set aside as protection in the event of a work stoppage. |
21 |
Required tooling capacity The contracted amount that the process was designed to accommodate over a specific period of time. |
22 |
Deliver to schedule Deliver to schedule separately supplied. |
23 |
Await manual pull Await non-EDI instruction before shipping. |
24 |
Reference to commercial agreement between partners The buyer's commitment is the one defined in the commercial agreement. |
26 |
Proposed Indicates that the scheduling information is a proposal. |