Qualifier Value
Qualifier values of 4017 in D15B
Delivery plan commitment level code (an1..3)
Code specifying the level of commitment to a delivery plan.
| Code | Description | 
|---|---|
| 1 | 
            Firm             Indicates that the scheduling information is a firm commitment.  | 
        
| 2 | 
            Commitment for manufacturing and material             Authorizes the supplier to start the manufacturing of goods.  | 
        
| 3 | 
            Commitment for material             Authorizes the manufacturer to order material required for manufacturing specified goods.  | 
        
| 4 | 
            Planning/forecast             An estimate of future requirements based on trends and actual information.  | 
        
| 5 | 
            Short delivered on previous delivery             Part of a consignment which was not delivered when the original delivery was made.  | 
        
| 6 | 
            Capacity available             Capacity is available to meet the requested scheduling demands.  | 
        
| 7 | 
            Promotion             All related schedule information refer to a promotion.  | 
        
| 8 | 
            Special demand             All related schedule information refers to a special demand.  | 
        
| 9 | 
            User defined             The user can interpret the meaning of the values from information exchanged previously.  | 
        
| 10 | 
            Immediate             Indicates that the scheduling information is for immediate execution.  | 
        
| 11 | 
            Pilot/Pre-volume             Initial products required in advance of the normal production process.  | 
        
| 12 | 
            Planning             An estimate of future requirements.  | 
        
| 13 | 
            Potential order increase             The possibility and magnitude of a schedule fluctuation.  | 
        
| 14 | 
            Average plant usage             The usual amount that a manufacturing facility will use over a specified duration.  | 
        
| 15 | 
            First time reported firm             Initial confirmation of a material requirement.  | 
        
| 16 | 
            Maximum             The highest attainable amount.  | 
        
| 17 | 
            Tooling capacity             The maximum amount that the process was designed to accommodate.  | 
        
| 18 | 
            Normal tooling capacity             The anticipated amount that the process was designed to accommodate over a specific period of time.  | 
        
| 19 | 
            Prototype             The preliminary version of a product or service.  | 
        
| 20 | 
            Strike protection             Product level that is set aside as protection in the event of a work stoppage.  | 
        
| 21 | 
            Required tooling capacity             The contracted amount that the process was designed to accommodate over a specific period of time.  | 
        
| 22 | 
            Deliver to schedule             Deliver to schedule separately supplied.  | 
        
| 23 | 
            Await manual pull             Await non-EDI instruction before shipping.  | 
        
| 24 | 
            Reference to commercial agreement between partners             The buyer's commitment is the one defined in the commercial agreement.  | 
        
| 26 | 
            Proposed             Indicates that the scheduling information is a proposal.  |